Climbing formwork

Climbing formwork 2023-11-29T09:48:01+01:00

Project Description

Climbing formwork

Used for high walls which are poured in different stages.

Climbing formwork is used for pouring high walls in different stages, if there is no blinding on one or two sides. In that case concrete is poured in layers and one climbs up along with the formwork. From the second layer onwards, the formwork is built on the climbing formwork.

There are 2 types of climbing formwork:

Climbing formwork 140: this has a running surface of 1.40 m and is mainly used for single-height formwork or on sites with little space.

Climbing formwork 240: this has a running surface of 2.40 m and is mainly used for multiple-height foemwork or in spaces where there is more room for movement.

Download our CLIMBING FORMWORK catalogue now ( pdf 438kb )

More info about our climbing formwork? Contact-us or your technical advisor.

Centre stage

Hoppe Residential Flats in Temse

September 9th, 2019|0 Comments

DCA recently started work on a brand-new housing project in Steendonk, a suburb of Temse and a stone’s throw from the Scheldt. Hoppe Residential Flats is a residential project with 38 flats, each bathed in light with its own spacious terrace. Main contractor DCA called on COMETAL to supply the formwork for the basement section.

R&D

Universeel loopplatform

June 21st, 2012|0 Comments

Het universeel loopplatform is een veiligheidsvoorziening die bestaat uit een beveiligde toegang en beveiligde werkconsole om bekistingswerken op hoogte uit te voeren.